08.05.2023
02.05.2023 Elevator Put into Operation

02.05.2023 A bed elevator was put into operation at Sigulda Hospital. Total elevator costs: 183,604 EUR. Sigulda Municipality's invested funds: 177,507 EUR, hospital's invested funds: 6,097 EUR, which were used for project expertise and elevator construction supervision.
The elevator shaft construction, elevator cabin delivery and installation was carried out by SIA "Rīgas lifti"